Repairs and Cleaning at WSAC

Dave Anderson

Work has been completed on repairs to the high roof above the dive area. 

The bubble machine that creates a pillow for divers to learn new tricks has been repaired, as well as a major valve in the filter for the pool. 

The deck, starting blocks and gutters have been power washed. 

The locker rooms have been cleaned up.  Using the big lift, the tops of the ventilation system have been dusted.  

Still to be completed is a drain, clean and refill of the tank and repairs to the flat roof section above the men’s locker room.

More photos: